Skip to content
코니아텍
A robot welding a steel pipe in a shower of sparks

Painting and rustproofing work is hard on people

Illustrative photo · not KoniaTech equipment or a KoniaTech project

On site

These are application scenarios, not delivered projects. Benefits are qualitative, and no figures are promised.

Painting and rustproofing environmentRelated Solution: Automotive

Painting and rustproofing work is hard on people

Painting and rustproofing expose operators to paint and dust. Giving repeated spraying to robots can reduce the time operators spend in hazardous areas.

!

Operational Challenge

Painting and rustproofing expose operators to paint and dust. Giving repeated spraying to robots can reduce the time operators spend in hazardous areas.

Core Friction

Painting and rustproofing work is hard on people

✓

Automation Approach & Benefit

Approach
Robot painting automation
Expected benefit
Worker protection

Useful to have ready before you ask

  • Painting or rustproofing processes to automate
  • Current working conditions and headcount
  • Paint types and supply method
  • Line layout and booth size

Custom Robotics Engineering Integration

⚙

Line-Specific Tailored Engineering

This application (robotic welding or painting) is engineered through dedicated multi-axis articulated robot arms, specialized end-effectors, and custom tooling designed to match your facility's exact takt time, cell dimensions, and line speed.

Engineering Delivery Pipeline

From initial site operational data analysis to line manufacturing, installation, integration testing, and commissioning, KoniaTech executes a unified engineering process to ensure reliable line stabilization.

  1. STAGE 01

    Analysis and design

    We analyse operating data and site needs, then design a custom automation setup.

  2. STAGE 02

    Manufacturing

    We build and assemble automation equipment.

  3. STAGE 03

    Installation

    Site installation scope is defined for each project.

  4. STAGE 04

    Commissioning

    Integration testing and commissioning stabilise the line.

  5. STAGE 05

    Operation and maintenance

    Operating support scope will be confirmed.

Scope of delivery is defined per project and verified through site engineering reviews.Discuss a project

From solution to inquiry

Links rest on how public materials group and describe each item, and engineering has not confirmed them. * marks a candidate link that no source states directly.

  1. 01Solution

    • Automotive
  2. 02Application(This page)

    • Painting and rustproofing environment
  3. 03Inquiry

Tell us about your site

Share your process and material flow, and we will review a suitable approach with you.