Skip to content
코니아텍
A warehouse with stacked boxes on racks and a passing forklift

Moving materials between processes depends on people

Illustrative photo · not a KoniaTech product or site

On site

These are application scenarios, not delivered projects. Benefits are qualitative, and no figures are promised.

Material transfer between processesRelated Solution: Smart Logistics

Moving materials between processes depends on people

When operators move materials between processes by cart or forklift, travel time grows and they leave their own process. Repeated transport on fixed routes can be considered for autonomous transport.

!

Operational Challenge

When operators move materials between processes by cart or forklift, travel time grows and they leave their own process. Repeated transport on fixed routes can be considered for autonomous transport.

Core Friction

Moving materials between processes depends on people

✓

Automation Approach & Benefit

Approach
AMR and AGV transport automation
Expected benefit
Shorter travel distances

Useful to have ready before you ask

  • Weight and size of the materials
  • Distance and route between processes
  • Trips per day and operating hours
  • Floor condition and slopes

Related product families

Links rest on how public materials group and describe each item, and engineering has not confirmed them. * marks a candidate link that no source states directly. Specifications repeat the current website and have not been checked against the source catalog. They are not confirmed.

  • CARRY(Candidate link)
Related product families
ModelsLoad capacitySize L×W×H (mm)Charge time
CARRY 300ELoad capacity:300 kgSize L×W×H (mm)740×545×270Charge time1 h
CARRY 300E-SRLLoad capacity:300 kgSize L×W×H (mm)740×545×285Charge time1 h
CARRY 300ELLoad capacity:300 kgSize L×W×H (mm)950×620×292Charge time1.5 h
CARRY 600ELoad capacity:600 kgSize L×W×H (mm)950×635×248Charge time1.5 h
CARRY 600E-SRLLoad capacity:600 kgSize L×W×H (mm)950×635×245Charge time1.5 h
CARRY 1200ELoad capacity:1,200 kgSize L×W×H (mm)1150×820×246Charge time1.5 h
CARRY 1200E-SRLLoad capacity:1,200 kgSize L×W×H (mm)1150×820×269Charge time1.5 h

Engineering Delivery Pipeline

From initial site operational data analysis to line manufacturing, installation, integration testing, and commissioning, KoniaTech executes a unified engineering process to ensure reliable line stabilization.

  1. STAGE 01

    Analysis and design

    We analyse operating data and site needs, then design a custom automation setup.

  2. STAGE 02

    Manufacturing

    We build and assemble automation equipment.

  3. STAGE 03

    Installation

    Site installation scope is defined for each project.

  4. STAGE 04

    Commissioning

    Integration testing and commissioning stabilise the line.

  5. STAGE 05

    Operation and maintenance

    Operating support scope will be confirmed.

Scope of delivery is defined per project and verified through site engineering reviews.Discuss a project

From solution to inquiry

Links rest on how public materials group and describe each item, and engineering has not confirmed them. * marks a candidate link that no source states directly.

  1. 01Solution

    • AMR and AMHS logistics automation
    • Smart Logistics
  2. 02Application(This page)

    • Material transfer between processes
  3. 03Product

    • CARRY Autonomous mobile robots(Candidate link)
  4. 04Inquiry

Tell us about your site

Share your process and material flow, and we will review a suitable approach with you.