Moving materials between processes depends on people
Illustrative photo · not a KoniaTech product or site
On site
Concept copyThese are application scenarios, not delivered projects. Benefits are qualitative, and no figures are promised.
Moving materials between processes depends on people
When operators move materials between processes by cart or forklift, travel time grows and they leave their own process. Repeated transport on fixed routes can be considered for autonomous transport.
Operational Challenge
When operators move materials between processes by cart or forklift, travel time grows and they leave their own process. Repeated transport on fixed routes can be considered for autonomous transport.
Moving materials between processes depends on people
Automation Approach & Benefit
- Approach
- AMR and AGV transport automation
- Expected benefit
- Shorter travel distances
Useful to have ready before you ask
- Weight and size of the materials
- Distance and route between processes
- Trips per day and operating hours
- Floor condition and slopes
Related product families
Needs checkingLinks rest on how public materials group and describe each item, and engineering has not confirmed them. * marks a candidate link that no source states directly. Specifications repeat the current website and have not been checked against the source catalog. They are not confirmed.
- CARRY(Candidate link)
| Models | Load capacity | Size L×W×H (mm) | Charge time |
|---|---|---|---|
| CARRY 300E | Load capacity:300 kg | Size L×W×H (mm)740×545×270 | Charge time1 h |
| CARRY 300E-SRL | Load capacity:300 kg | Size L×W×H (mm)740×545×285 | Charge time1 h |
| CARRY 300EL | Load capacity:300 kg | Size L×W×H (mm)950×620×292 | Charge time1.5 h |
| CARRY 600E | Load capacity:600 kg | Size L×W×H (mm)950×635×248 | Charge time1.5 h |
| CARRY 600E-SRL | Load capacity:600 kg | Size L×W×H (mm)950×635×245 | Charge time1.5 h |
| CARRY 1200E | Load capacity:1,200 kg | Size L×W×H (mm)1150×820×246 | Charge time1.5 h |
| CARRY 1200E-SRL | Load capacity:1,200 kg | Size L×W×H (mm)1150×820×269 | Charge time1.5 h |
Engineering Delivery Pipeline
From initial site operational data analysis to line manufacturing, installation, integration testing, and commissioning, KoniaTech executes a unified engineering process to ensure reliable line stabilization.
- STAGE 01
Analysis and design
We analyse operating data and site needs, then design a custom automation setup.
- STAGE 02
Manufacturing
We build and assemble automation equipment.
- STAGE 03
Installation
Site installation scope is defined for each project.
- STAGE 04
Commissioning
Integration testing and commissioning stabilise the line.
- STAGE 05
Operation and maintenance
Operating support scope will be confirmed.
From solution to inquiry
Needs checkingLinks rest on how public materials group and describe each item, and engineering has not confirmed them. * marks a candidate link that no source states directly.
01Solution
02Application(This page)
- Material transfer between processes
03Product
- CARRY Autonomous mobile robots(Candidate link)
04Inquiry
Tell us about your site
Share your process and material flow, and we will review a suitable approach with you.